Jumbo’s Fairplayer has completed the pre-installation and tensioning of a shallow water CALM buoy mooring system for the Mersa El-Hamra terminal offshore Egypt.
Jumbo’s scope included the pre-lay of 10 Stevshark drag anchors and 6 chain moorings and the subsequent tensioning of the mooring legs up to 512 tonnes.
The work was conducted for the client WEPCO / Micoperi.
“Jumbo would like to thank the specialised teams who contributed towards making this project possible. We look forward to our next offshore mooring installation,” the company said.